NSU to install Anemoi’s rotor sails on Vale’s VLOC
NewsNSU and Vale will install five Anemoi rotor sails on a 400,000dwt VLOC, aiming to reduce fuel consumption and CO2 emissions by 6-12%.
Construction of a new 315m long quay and 3.6 hectare operations area is underway at the Port of Stade-Bützfleth on the River Elbe, with completion scheduled for the end of this year. Following a public tender, the work is being carried out Tiefbau GmbH Unterweser and Ludwig Freytag.
By registering you will have: